Zhejiang Artsen Chemical Co.,LTD. Project Environmental Impact Assessment Information Publicity
Zhejiang Exa Chemical Co., Ltd. Annual output of 28000 tons of 1,1-difluoroethane (R152a) and 8000 tons of 1,1,1-trifluoroethane (R143a) projects
Environmental impact assessment information publicity
According to the Interim Measures for Public Participation in Environmental Impact Assessment, the Implementation Opinions on Effectively Strengthening Public Participation in Environmental Impact Assessment of Construction Projects and the Notice on Standardizing the Implementation of Public Participation System in Environmental Impact Assessment of Construction Projects, publicity must be carried out before the environmental impact report of this project is carried out, so that a wider range of social organizations and the public can understand and participate in the environmental impact assessment of the project. The relevant contents are hereby announced as follows:
Brief Description of 1. Construction Project
Project Name:Zhejiang Exon Chemical Co., Ltd. annual output of 28000 tons of 1,1-difluoroethane (R152a), 8000 tons of 1,1, 1-trifluoroethane (R143a) project
Nature of Project:Expansion
Project scale:Annual output of 28000 tons of 1,1-difluoroethane (R152a) and 8000 tons of 1,1,1-trifluoroethane (R143a)
Distribution of main environmental sensitive targets within the scope of 2. assessment
According to the site survey, the distribution of the main environmental sensitive points around the project is shown in the table below.
Table1PROJECT ENVIRONMENTAL PROTECTIONTarget and Protection LevelList
|
environmental elements |
Name |
Coordinates/m |
Protection object |
Protection of content |
Environmental functional area |
Relative bearing |
Closest distance to the factory boundary |
Remarks |
|
|
X |
Y |
||||||||
|
Atmosphere |
Zhenhai Village |
299355 |
3337275 |
Crowd |
Ambient air |
Level II |
SE |
1400m |
More than 1800 people |
|
Zhendong Village |
299908 |
3336755 |
Crowd |
SE |
2300m |
More than 2300 people |
|||
|
Fengmian Village |
298737 |
3336961 |
Crowd |
SE |
1100m |
More than 2500 people |
|||
|
Zhuhai Village |
298005 |
3336757 |
Crowd |
S |
1000m |
More than 1500 people |
|||
|
Union Village |
297107 |
3336284 |
Crowd |
SW |
1600m |
More than 2500 people |
|||
|
Development Zone Living Area |
296571 |
3336705 |
Crowd |
SW |
1400m |
More than 1200 people |
|||
|
Water |
Center River |
Water body |
Surface water environment |
Class III |
S |
Next |
Creek |
||
|
Sound |
Within 200m of the factory boundary and outside the factory boundary |
Factory boundary |
Acoustic environment |
3 categories |
Four sides |
Within 200m |
|
||
|
Note: "Orientation" in the table is based on the project site, and "Distance" refers to the nearest distance between the protection target and the plant boundary. |
|||||||||
Forecast of main environmental impacts in 3.
1. Waste gas: The waste gas generated by the project is mainly acetylene, halogenated hydrocarbons, HF, HCl, chlorine, dust, NOx, SO2, smoke, etc. After the gas from the directional reformer in the plant area is absorbed to obtain hydrofluoric acid solution and sodium sulfite solution, the tail gas is discharged through the exhaust cylinder to meet the standard; other waste gas in the plant area is mainly acid gas, which is discharged after spray treatment. It is predicted that the exhaust gas after the completion of the project has little impact on the surrounding environment.
2. Wastewater: The wastewater generated by the project mainly includes production alkali washing wastewater, equipment and ground cleaning wastewater, cooling system sewage and initial rainwater. The wastewater in the plant is mainly fluorine-containing wastewater, which is treated by the existing double calcium defluorination process in the plant and then sent to Shangyu Sewage Treatment Plant for treatment. The wastewater receiving pipe of the Project has basically no impact on the nearby rivers.
3. Solid waste: the solid waste of the project can be "zero" discharged after being recycled, treated by qualified units and transported to landfill, which basically has no impact on the surrounding environment.
4. Noise: The noise generated by the project can be discharged up to standard after corresponding treatment, and the surrounding sound environment meets the standard requirements.
After the completion of this project, through the adoption of advanced and effective pollution control measures, the discharge of various pollutants can be effectively controlled, and the environmental quality can be maintained at the current level, so it is in line with the principle of maintaining environmental function zoning.
4.Main environmental protection measures to be taken, risk prevention measures and expected effects
Table 2 Summary of Main "Three Wastes" Pollution Prevention Measures of the Project
|
Kind |
Name of measures |
Expected effect |
|
Waste water |
Strictly implement clean and sewage diversion and rain and sewage diversion; after the project wastewater is collected, it will be treated by the wastewater treatment station in the plant area and then enter Shangyu Sewage Treatment Plant. |
Standard acceptance tube |
|
Exhaust gas |
After the gas from the directional reformer in the plant area is absorbed to obtain hydrofluoric acid solution and sodium sulfite solution, the tail gas is discharged through the exhaust cylinder to meet the standard; other waste gas in the plant area is mainly acid gas, which is discharged after spray treatment. |
Standard discharge |
|
solid waste |
Hazardous waste shall be sent to qualified units for treatment, and general solid waste shall be entrusted for disposal or recycled by suppliers. |
harmless treatment |
|
Noise |
Pay attention to equipment selection, try to choose low noise equipment. |
Standard |
|
accident prevention |
① Further improve the environmental risk emergency plan, and it is recommended to entrust professional units to prepare; ② Improve emergency facilities according to the emergency plan; ③ Carry out emergency drills and strengthen daily management. |
Control environmental risks within tolerable limits |
Preliminary Conclusions of 5. Environmental Impact Assessment
Zhejiang Exon Chemical Co., Ltd. has an annual output of 28000 tons of 1,1-difluoroethane (R152a) and 8000 tons of 1,1, 1-trifluoroethane (R143a) to be built in the existing plant area of Hangzhou Bay Shangyu Economic and Technological Development Zone. The construction of the project meets the requirements of planning and environmental function zoning; conforms to the national industrial policy and meets the requirements of planning environmental assessment; the pollutants discharged meet the national and provincial pollutant discharge standards and the requirements of the total discharge control index of major pollutants; the project pollutants After treatment, it can be discharged up to the standard, and the impact on the surrounding environment is within an acceptable range.
From the perspective of environmental protection, it is feasible to construct the project in the proposed plot.
Contents of 6. solicitation of opinions
1. Object and scope of soliciting opinions
The social groups and masses that may be affected within the scope of assessment are mainly the enterprises near the project site and the surrounding villages.
2Time limit for soliciting opinions
Time for public comments: from April 9, 2019 to April 22, 2019, a total of 10 working days.
3. Public feedback channels
The public can express their opinions on project construction and EIA work by calling, writing or interviewing the contact information left by the construction unit and EIA unit.
Contact Information of 7. Environmental Protection Approval Department, EIA Unit and Project Construction Unit
1. Contact Information of Environmental Protection Approval Department
Project approval department: Shangyu Branch of Shaoxing Ecological Environment Bureau
Tel: 0575-82133913
2. Name and contact information of the environmental impact assessment institution undertaking the assessment work
EIA Unit: Hangzhou Environmental Protection Research Institute Co., Ltd.
Certificate number; National EIA Certificate B Zi No. 2015
Address: 288 Gongxiu Road, Xiaoshan District, Hangzhou City
Telephone: 15606712077
Email:13456999308@126.com
3. Contact information of construction unit
Construction unit: Zhejiang Exon Chemical Co., Ltd.
Address: Hangzhou Bay Shangyu Economic and Technological Development Zone
Tel: 18957545289 Contact: Shen Gong
Announcement Issued by: Zhejiang Exon Chemical Co., Ltd.
Published: April 8, 2019